Technology Adoption

Site Explanation: Technology Adoption Technology readiness, commercial readiness, and actual adoption are separate. A system may work technically but lack suppliers, financing, warranties, regulation, service, or customer confidence. An announcement is not an adoption event. Praevoium should retain a technical-readiness scale, a commercial-readiness scale, and a project deployment ladder from conceptual mention through contracted, installed, commissioning, commercial operation, and sustained ope

Interpretation rule: Results are derived estimates. They are not reported facts unless the inputs themselves come from directly reported, scope-matched evidence.

Installed-Base Adoption

tech/total*100
Derived result

Use operating assets only.

New-Deployment Adoption

tech/total*100
Derived result

Measures current deployment behavior, not cumulative penetration.

Adoption Growth Rate

(current-prior)/prior*100
Derived result

High growth can still occur from a very small base.

Announcement Realization

operating/due*100
Derived result

Compare projects scheduled for the same period.

Availability-Adjusted Capacity

installed*(availability/100)
Derived result

Secondary performance measure; preserve rated installed capacity separately.

Status-Weighted Pipeline

concept*.05+announced*.10+contracted*.60+construction*.80+commissioning*.95
Derived result

Default weights are analytical indicators, not validated probabilities.