Battery Cost Normalization
Site Explanation: Battery Cost Normalization Battery cost can refer to materials, cells, modules, racks, containers, DC blocks, AC systems, installed equipment, EPC contracts, total project cost, net cost after incentives, or lifecycle cost. A single $/kWh value is not comparable until scope is defined. Power in MW and energy in MWh should remain separate. Duration equals usable energy divided by rated power. Cost per kW emphasizes power equipment, while cost per kWh emphasizes stored energy. Lo
Rated Duration
—
Use the same AC or DC boundary for both inputs.
Cost per kW
—
State whether cost is equipment-only, EPC, total project, or net cost.
Cost per Usable AC kWh
—
Do not substitute gross nameplate energy for usable AC energy.
Usable-Energy Ratio
—
Identify beginning-of-life, guaranteed, or demonstrated usable energy.
Round-Trip Efficiency
—
State whether values are measured at DC terminals or the grid interconnection.
Required Beginning-of-Life Capacity
—
Supports degradation and augmentation planning.
Net Project Cost
—
Use monetized incentive value, not only nominal credit percentage.
Simplified LCOS
—
Requires a consistent discount rate, operating life, cycle profile, degradation, and charging-cost treatment.